04 Feb 2009 @ 9:35 AM 
 

Types of Requirements Elicitation

 

1.B.3-Types of Requirements Elicitation

Greenfield Engineering


Development starts from scratch, no prior system exists, and the requirements are extracted from the end

users and the client Triggered by user needs


Re-engineering

Re-design and/or re-implementation of an existing system using newer technology Triggered by technology

Enabler.


-must understand business role and logic.

Interface Engineering

Provide the services of an existing system in a new environment triggered by technology enabler or new market

needs

 


 

Tags Tags: , ,
Categories: IT, SAD
Posted By: admin
Last Edit: 04 Feb 2009 @ 09 35 AM

Permalink PDF Version
 

Responses to this post » (None)

 

Sorry, but comments are closed. Check out another post and speak up!

 Comment Meta:
RSS Feed for comments
\/ More Options ...
Change Theme...
  • Users » 1
  • Posts/Pages » 152
  • Comments » 0
Change Theme...
  • VoidVoid
  • LifeLife « Default
  • EarthEarth
  • WindWind
  • WaterWater
  • FireFire
  • LiteLight
  • No Child Pages.
  • No Child Pages.
  • No Child Pages.
  • No Child Pages.
  • No Child Pages.